Hebei Trico Formwork & Scaffolding
Home > Products > Formwork Clamp
Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio
  • Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio
  • Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio
  • Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio
  • Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio
  • Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio
  • Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio
Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and TrioAlignment Formwork Clamp BFD for Peri Formwork Panel Maximo and TrioAlignment Formwork Clamp BFD for Peri Formwork Panel Maximo and TrioAlignment Formwork Clamp BFD for Peri Formwork Panel Maximo and TrioAlignment Formwork Clamp BFD for Peri Formwork Panel Maximo and TrioAlignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio

Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio

Product Introduction:

Alignment formwork clamp BFD is a multi-functional connector in Peri  formwork Panel Maximo and Trio formwork systems. The BFD clamp ensures neat panel joints resulting in perfect concrete finishes. With only one component, every panel connection is flush, aligned and tight.

Product Details

Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio

Alignment formwork clamp BFD is a multi-functional connector in Peri  Formwork Panel Maximo and Trio formwork systems. The BFD  clamp ensures neat panel joints resulting in perfect concrete finishes.With only one component, every panel connection is flush, aligned and tight.

7-Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio.jpg

Item No

Forged formwork fasteners

Type

Formwork clamp

Product name

Formwork BFD clamp

Warranty

1 year

Application

Formwork construction,Office Building

Material

S355JR

Size

290mmX400mm,OR as your request

Weight

4.2kg,3.9kg,3.6kg

Surface treatment

Galvanized, Zinc coated

Service

OEM,ODM

Package

Plywood And Case Box

The BFD clamp guarantees strong joints and fast assembly of the panels.

This is the main component used to join formwork panels. With one single strike of the hammer, it can be used to make panel connections tight joint, no any concrete leak.

The BFD clamp ensures a flexurally stiff connection of panels and allows large units to be moved.

8-Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio.jpg

9-Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio.jpg

10-Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio.jpg

11-Alignment Formwork Clamp BFD for Peri Formwork Panel Maximo and Trio.jpg

We also have other related clamps and tools for formwork:

Picture

Size

Weight

Material

Feature

Surface

Treatment

Packaging

1.jpg

/

2.83kgs

2.5kgs

2.4kgs

QT450-10

High Strength

Black/Silver

1.Ton Bag

2.Wooden Box

2.jpg

69*105*3mm

310g

Carbon Steel

Teeth with Heat Treatment

Painted/

Galvanized

1.Woven Bag+Ton Bag

2.Woven Bag+Pallet

3.Carton+Pallet

75*110*3.75mm

420g

75*110*4mm

450g

Other Sizes are Available

3.jpg

70*105*3mm

380g

Carbon Steel

Teeth with Heat Treatment

Painted/

Galvanized

1.Woven Bag+ Ton Bag

2.Woven Bag+Pallet

3.Carton+Pallet

75*110*3.75mm

410g

Other Sizes are Available

4.jpg

/

2.9kgs

Carbon Steel

Teeth with Heat Treatment

Galvanized

Carton+Pallet

5.jpg

/

3.2kgs

Carbon Steel

Teeth with Heat Treatment

Galvanized

Carton+Pallet


Attach a file