What are the responsibilities of Aluminium Formwork engineering?
Aluminium Formwork System
1. Implement relevant national, local and industrial standards, regulations, technical standards and relevant rules and regulations formulated by superiors, and be responsible for inspection and supervision of project implementation.
2. Responsible for compiling the construction schedule of Aluminium Formwork System and organizing implementation, establishing a construction log, and responsible for the construction records of special processes/critical processes. Organize the promotion, application and implementation of new materials, new technologies, new processes and new equipment.
3. Responsible for the overall management, supervision and assessment of each sub-contractor and designated subcontractor of the project department.
4. Responsible for organizing the project quality meeting of the project department, coordinating the relationship among the participating units, coordinating the construction sequence, and solving the construction contradiction.
5. Responsible for the organization of the protection of finished products and semi-finished products, and the maintenance and repair work after the delivery of the project required by the contract.
6. Responsible for assisting the technical and quality departments to control the nonconforming products and implement corrective and preventive measures. Assist the materials department in the selection and ordering of materials and equipment, and participate in the inspection of important materials and equipment. Responsible for the inspection and testing of engineering materials and construction, and participate in the project concealed acceptance and project acceptance.
7. Responsible for supervising and inspecting the marking of materials, equipment, construction process and completion projects, responsible for the specific quality management of the construction site, and ensuring a safe and civilized construction environment.
8. Responsible for on-site construction machinery and equipment deployment, maintenance inspection, responsible for equipment status record and identification management. Responsible for controlling engineering measurements, calibration, use, repair and maintenance of various inspection, measurement and test equipment.
9. Participate in the drawing review, summarize the drawings and review the records, handle the project changes and negotiate, and prepare the construction plan/plan, quality plan, special process and key process construction plan.
10. Responsible for the unified management of the technical documents and materials of the project department, save the construction records, and be responsible for the preparation, assembly and handover of construction technical materials and completion data.