Aluminum formwork is the best choice for both high and low-rise concrete construction projects.Aluminum form ties secure aluminum forms in order to pour the desired wall thickness.These wall ties are used predominantly for poured wall basement foundations.
Features
Available in both Full & Nominal sizes.
Designed for easy break off.
3,600 safe work load with a 2:1 safety factor.
Made from high strength steel to ensure consistent quality.
Ties are compatible with all major aluminum forming systems in the industry.
What is the difference between the Nominal Tie and Full Tie?
They look almost the same from the feature, but with different lengths.For example, Wall ties used in the forming of cast-in-place concrete walls are made in nominal or full dimensions. An 8-inch nominal wall tie does not measure a full 8 inches in width and therefore, when used, will not result in an 8-inch thick concrete wall. An 8-inch full wall tie, as the name implies, does measure a full 8 inches and will result in an 8-inch thick concrete wall. Therefore, nominal size wall ties are not acceptable, full dimension wall ties are required.
Besides, we Trico also supply different formwork wedges and pins for the alumium system, such as standard round head pin, combo pin, flat short head pin,curved wedge, straight wedge, etc.
When ordering, please make sure to specify standard(nominal) or full tie dimension.