Steel Plank Hook is made by carbon steel. It will be welded on the steel plank to fix steel frame. Steel hook has different thickness and length. Generally it will be used for 48mm pipe. Customized supporting also. Besides, we also supply whole set scaffolding frames with steel plank.
Galvanized scaffolding steel walking plank hook
Product name | Galvanized Scaffolding pedal parts Walking board Scaffolding Hook |
Material | Q235 Steel |
Tube Diameter | 48.3mm |
Certificate | CE,ISO |
Surface finish | HDG or Pre-galvanized |
Color | Orange,Silver or any color |
Service | ODM OEM Service |
Length | 1m-4m |
MOQ | 1000 pieces |
Payments | T/T,West Union,Cash |
Delivery Time | About 7-10 days after confirmation |
Packing | In bulk,steel pallet or as your request |
Production capacity | 200 tons/day |
Five Promises:
1.Quality: Strictly control the quality through three levels. First level, quality test on the producing line. Second level, quality test during warehousing. Third level, quality test before loading.
2.Timeliness: 24 hours online.Provide consulting and quotation services for customers all the time.
3.Veracity: Strictly follow the customer standard to ensure the tolerance range and meet customer's requirement.
4.Integrity: If The customer complains about the quality of the products, our company will actively cooperate with them to solve the problem. If it is the responsibility of our company, we will bear the corresponding responsibility and compensation.
5.Longevity: Establish good long-term relationship with customers.
Steel-Ply Formwork for Concrete Construction
Dec. 20, 2024Adjustable Scaffolding Steel Props
Dec. 20, 2024Prop Sleeve with Nut from Hebei Trico
Dec. 13, 2024